#1. When marking up a site, which colour is used to represent the position of the hand dig area?
#2. Which document provides guidance whilst working in the vicinity of underground services?
#3. When using the CAT to estimate depth, which mode should be used?
#4. What colour is a low voltage electric cable
#5. What would be the most common consequence of damaging an LPG supply?
#6. When conducting a visual search of the work location, what would identify the possible presence of a telecommunication service, as seen on ironwork within a footway?
#7. Which model of CAT is able to record location?
#8. According to HSG 47, how often should the ground be scanned during the excavation process, as a maximum?
#9. How can it be confirmed that the CAT is in working order
#10. PAS 128 has FOUR recognised stages to the process, which stage is conducted first?